Winsor Dam is the main dam of the Quabbin Reservoir, an earthen dam across the Swift River at the south-west corner of the reservoir in Belchertown, inside Quabbin Park. It and Goodnough Dike were built in the 1930s and together hold back 412 billion gallons of water. The visitor center is at its west end, and you can walk or bike across the top for free. Cars are not allowed on it.

It is named for Frank E. Winsor, the engineer appointed in 1926 to run the Quabbin project. He died in 1939, the year the reservoir began to fill, before the water ever reached the spillway.

Quick Facts

Winsor Dam at a Glance

What it isMain earthen dam of the Quabbin Reservoir
RiverSwift River
WhereQuabbin Park, Belchertown — West entrance, Route 9
Built1930s (reservoir began filling 1939)
Named forFrank E. Winsor, chief engineer
On foot / bikeYes, free
By carNo — vehicles not allowed across
Visitor centerWest end · (413) 323-7221

How to Visit Winsor Dam

Turn in at Quabbin Park's West (main) entrance on Route 9 in Belchertown, 100 Winsor Dam Road, and park at the Administration Building, where the visitor center is. The dam starts at the rotary beside the building. DCR keeps cars off both the dam and Goodnough Dike for security, so the dam is a walk, not a drive. DCR's own winter guide suggests bringing bikes and helmets to ride across on a mild day.

Parking at the main entrance is limited. If it's full, the rest of Quabbin Park is through the Middle and East entrances on Route 9, but there is no driving from there to the dam.

The Spillway and the Y Pool

At the north end of the dam, the spillway carries overflow out of the reservoir once the water reaches a set level. When the reservoir is full and the spillway is running, DCR's trail guide says you can see a waterfall from the Spillway Bridge and from the trail below it. The spillway water and the water released from the power station meet below the dam in the "Y" Pool, named for its shape from above. That is also where the rerouted Swift River rejoins its original bed and flows south.

The reservoir first reached the spillway in 1946, seven years after filling began on August 14, 1939, according to the MWRA. Under a 1931 U.S. Supreme Court settlement with Connecticut, the Friends of Quabbin chronology notes, Massachusetts agreed to keep the Swift River flowing below the dam with a release of 20 million gallons a day.

Walks Around the Dam

Full trail details are on the trail map page.

Fly Fishing Below Winsor Dam

The Swift River from the Y Pool down to Route 9 is the one place in Quabbin Park where fishing is allowed, and it is open all year: fly fishing only, catch and release, from 4 a.m. to 9 p.m. Wading in waders is allowed. A no-trespassing zone surrounds the power station, and the river, the Y Pool and the Route 9 parking area are closed from 11 p.m. to 4 a.m. Reservoir fishing rules are separate; see the fishing guide.

A Short History

For the bigger story, see Quabbin history and Goodnough Dike.

Rules on the Dam

No dogs, even on a leash; no drones; no alcohol. Obey posted security signs. The dam is open during Quabbin Park's posted hours; see hours.

Black-and-white photo of workers at the Winsor Dam spillway on June 22, 1946, the day the reservoir was full
Black-and-white 1941 photo of a crowd at the dedication of the Winsor Memorial overlooking Winsor Dam
FAQ

Winsor Dam FAQ

Where is Winsor Dam?

In Quabbin Park, Belchertown, at the West (main) entrance on Route 9, 100 Winsor Dam Road. The Quabbin Visitor Center is at its west end.

Can you walk across Winsor Dam?

Yes. Walking and biking across Winsor Dam are free. Cars are not allowed across it.

Who is Winsor Dam named after?

Frank E. Winsor, appointed chief engineer of the Quabbin project in 1926. He died in 1939.

When was Winsor Dam built?

In the 1930s, with Goodnough Dike (completed 1938). The reservoir began filling on August 14, 1939, and first flowed over the spillway in 1946.

Can you fish at Winsor Dam?

Only below it: the Swift River from the Y Pool to Route 9 is open all year for catch-and-release fly fishing, 4 a.m. to 9 p.m.